Hillcrest ES

Project Description

Project Description: Tremco BUR w/grave (Rockit & White Marble)
Customer Name: Baltimore County Public Schools
Location: Hillcrest ES, 1500 Frederick Rd., Baltimore, MD
Roof/Metal Square Footage: 61,300 BUR sf
Other Key Partners: Tremco Roofing Products, Firestone Roofing Projects, Langenfelder Mechanical, BFM Architects, Rockville Iron works
Other: As-built job’s, where we could work in conjunction with BFM Architects to provide the best system and products for BCPS.

General Project Overview

  • What was worked on? Re-moved and replaced roof, metal flashings, trimmed trees hanging over roof, installed new Tremco flush panels around bump ups on roof, New roof drains and scuppers, Installed new white over clear square skylights (exterior and interior), replacement of roof ladders and hatches
  • What specific materials were needed? Tremco Wall Panels, Tremco Roofing Products, Velux skylights, Firestone insulation.
  • EXAMPLE: “Rehab of exiting science building and new addition. Scope includes Centria insulated wall panels, aluminum ACM panels, soffits and copings and Zinc ACM panels.”
  • T/O & replace roof system, full taper, 4 ply, Rock it & Stone SM edge flashings. Scope includes Tremco Wall Panels and  Roofing Products, Velux skylights, new drains, new edge flashings and ladders.

Full Project Description

  • Challenges and how they were overcome? Working during the night, Competing with Spring Showers, Limited Staging Areas, Provided extra lights and man power, worked weekends, over time and part of summer to overcome.
  • Final result? Quality job with a happy customer, Metal panels around both penthouses provides new look to building, New roof ladders at elevation changes.

Johnnycake ES

Project Description

Project Description: Tremco BUR w/grave (Rockit & White Marble). Alphaguard on SP roof recover
Customer Name: BCPS
Location: Johnnycake ES, 5910 Craigmont Rd., Baltimore, MD
Roof/Metal Square Footage: 54000 sf BUR 9000 sf SP
Other Key Partners: Tremco Roofing Products, Firestone Roofing Products, Langenfelder Mechanical, BFM Architects, Rockville Iron Works

General Project Overview

  • What was worked on? Removed & replace roof system, full taper, 4 ply, SM edge
    flashing, new roof drains and gutters, recover SP roof with Alphaguard Bio, Installed new
    ladders at change in elevations, new roof hatches
  • What specific materials were needed? Tremco Roofing Products, Firestone Roofing
    Products, Zurn Drains
  • EXAMPLE: “Rehab of exiting science building and new addition. Scope includes Centria
    insulated wall panels, aluminum ACM panels, soffits and copings and Zinc ACM panels.”
  • Removed & replace roof system, full taper, 4 ply, Rockit & Stone SM edge flashings.
    Scope includes Firestone insulation, Tremco Roofing Products, Tremco Restoration
    Products, new drains, edge flashings, ladders.

Full Project Description

  • Challenges and how they were overcome? Working during the night, Competing with Spring Showers, Limited Staging Areas, Provided extra lights and man power, worked weekends, over time and part of summer to overcome.
  • Final result? Great Job, and happy customer, 9000sf of alphaguard restoration over EPDM, New roof ladders at elevation changes

City Garage

 

 

Project Description

Customer Name: Southway Builders
Location: 101 West Dickman Street, Baltimore, MD 21230
Roof/Metal Square Footage: 167,541 sq. ft. wall panels
Other Key Partners:
Under Armor/ Sagamore – Owner, Firestone – Roof system manufacturer, Centria – wall system manufacturer

General Project Overview

New 138,700 sq ft, TPO roofing and 28,841 sq ft wall panels

Full Project Description

New collaborative space opened by Sagamore Development through the renovation of an old Baltimore City bus maintenance building. Full roof replacement with deck infill. Architectural feature of a band of black insulated metal wall panels around exterior perimeter walls with custom red at entrances requiring close coordination between the framing and glazing contractor.

Extremely fast paced project with multiple last minute design changes. The project schedule demanded flexible scheduling and even required work through the Labor Day holiday in order to meet the needs of the client.

Great project team embracing a spirit of cooperation and collaboration spearheaded by strong teams from Southway, Sagamore, and other trade contractors. In the end, the project was completed on time to the delight of a very pleased owner.